Notice: Undefined variable: is_wp_mobile in /home/asianloto/public_html/wp-includes/vars.php on line 149
Scaffolding Tags – 4 – arasko

Scaffolding Tags – 4

1.00

In stock

Model : ALC – SCF – T 4

Compare
Category:
  • The scaffold must be inspected prior to being used for the first time, following exposure to weather conditions likely to have affected its strength or stability, after substantial addition, dismantling or other alteration and at intervals not exceeding 7 days from the date of last inspection.
  • This specially designed insert system ensures that all the concerned people are well aware of the current status of the structure.
  • A scaffold should be fitted at all ladder access points from the first build stage and is to remain on the structure until dismantled thereby communicating a safety message to all.
  • By adopting the scaffold, you are demonstrating your duty of care to your workers and that you have done everything reasonably practical to ensure safe access and egress from the place of work as well as giving them as much information required to work safely.
Submit your review

Your email address will not be published. Required fields are marked *

Reviews

There are no reviews yet.

See It Styled On Instagram

    Instagram did not return a 200.

Main Menu

Scaffolding Tags - 4