- he scaffold must be inspected prior to being used for the first time, following exposure to weather conditions likely to have affected its strength or stability, after substantial addition, dismantling or other alteration and at intervals not exceeding 7 days from the date of last inspection.
- This specially designed insert system ensures that all the concerned people are well aware of the current status of the structure.
- A scaffold should be fitted at all ladder access points from the first build stage and is to remain on the structure until dismantled thereby communicating a safety message to all.
- By adopting the scaffold, you are demonstrating your duty of care to your workers and that you have done everything reasonably practical to ensure safe access and egress from the place of work as well as giving them as much information required to work safely.
Shop By Department
- Lockout Tagout
- Lockout Hasp
- Cable Lockout
- Valve Lockout
- Cylinder Lockout
- Pneumatic Lockout
- Plug Lockout
- Pin & Sleeve Lockout
- Circuit Breaker Lockout
- Blocking Bar Lockout
- Fuse Lockout
- Electrical Panel Lockout
- Lockout Padlock
- Open Lockout Station
- Shadow Lockout Station
- Lockout Tagout Station
- Key Cabinet
- Padlock Cabinet
- Group Lock Box
- Energy Source Identification Tags
- Safety Lockout Banner
- Lockout Kit
- Lockout Poster
- Lockout Bag & Pouch
- Single Use Lockout
- Confined Space Lockout
- Lockout Accessories
- Steering Wheel Cover
- Blind Flange Lockout
- Scaffolding Tags
- Traffic & Road Safety
- Industrial Safety Products
- Stanchion Post & Accessories
Reviews
There are no reviews yet.